A higher-risk building in England is one at least 18 metres or seven storeys high with at least two homes. For these buildings, the Building Safety Regulator is the building control authority. Work can't start until the BSR approves the gateway 2 application, which must show how the building will comply, with the fire and structural strategy, a construction control plan, a change control plan and a mandatory occurrence reporting plan. The building can't be occupied until the BSR issues a completion certificate at gateway 3, which needs the as-built information and proof that the golden thread has been handed to the accountable person.
The golden thread is the information that shows the building is safe and how it stays safe. It has to be digital, secure, available when needed, usable and a single source of truth. In practice it arrives from dozens of consultants and subcontractors: drawings in many revisions, specifications, product data sheets, fire test evidence, site inspection records, photos and commissioning certificates. Much of it sits in the common data environment, but just as much sits in email and subcontractor folders. Before gateway 3 and handover, people spend weeks proving that what was built matches what was approved, and that every controlled change was recorded.
Once the building is occupied, the principal accountable person keeps it up to date for the life of the building: the fire and structural safety measures, maintenance and inspection records, mandatory occurrence reports and complaint summaries for seven years, and the safety case. The BSR, other accountable persons and residents can ask for it. Gateway decision times have improved through 2026 as the regulator changed how it assesses applications, and a complete, well-organised submission remains the part a developer controls.